Coho 6

After more hours (almost a whole Sunday). Had to redo a lot of the wiring (need to use 22 gauge and duh!, read the instructions).

Note the laser levelling (not finalized though)

Next step is to commit to the shape with epoxy in the seams.

2 thoughts on “Coho 6”

Leave a Reply

Your email address will not be published. Required fields are marked *